Nissan is donating two of their DC fast charge units to the City of Atlanta. Lets start a conversation about where these need to be installed.
Some of my criteria
[*] Public accessible location
[*] Near adequate power
[*] A whlling host
Waht else is needed and where do you think they should be instaled.





